<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>02565nam a2200181Ia 4500</leader>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">27120</subfield>
    <subfield code="d">27120</subfield>
  </datafield>
  <controlfield tag="003">OSt</controlfield>
  <controlfield tag="005">20220303155004.0</controlfield>
  <controlfield tag="008">140128s9999    xx            000 0 und d</controlfield>
  <datafield tag="082" ind1=" " ind2=" ">
    <subfield code="a">631.3</subfield>
    <subfield code="b">BAB/MA</subfield>
  </datafield>
  <datafield tag="100" ind1=" " ind2=" ">
    <subfield code="a">Babu V </subfield>
  </datafield>
  <datafield tag="245" ind1=" " ind2=" ">
    <subfield code="a">Mathematical model for sediment yield in agricultural watershed</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a">Tavanur</subfield>
    <subfield code="b">Department of Land and Water Resources and Conservation Engineering, Kelappaji College of Agricultural Engineering and Technology</subfield>
    <subfield code="c">1998</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="b">MTech.</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
    <subfield code="a">The knowledge of temporal distribution of sediment yield is required in 
the design and operation of soil and water conservation programmes on 
watershed basis. For the project planning purposes, the estimates made are 
mostly based on experience. Such estimates are very approximate and grossly 
inadequate for engineering analysis. Therefore there is an urgent need for 
, 
rational analysis of erosion data from catchments, inorder to obtain relationship 
for erosion rate. Therefore a mathematical daily sediment yield model is 
developed for Thuthapuzha drainage basin (940 km2 ) of Bharathapuzha basin, 
corresponding to Muskingum routing equation. The model is based on 
combined approach of translation and routing for simulating sediment graphs. 
Thirty seven selected storm events of the drainage basin observed during 1986- 
92 are used for estimation of model parameters by Lagrange multipliers method 
and three storm events of 1993 are used for verification of the model. 
The model is used to compute temporal distribution of suspended 
sediment yield on storm basis and their performance is evaluated both 
qualitatively and quantitatively. Mathematical relationships of mobilized 
~ 
sediment with effective rainfall; computed sediment flow rates with observed 
sediment flow rates and observed and computed sediment flow with effective 
rainfall and mobilized sediment were also established. The Correlation 
Coefficient of all those equations are found to be close to one. The statistical 
measures of Percentage Absolute Error in peak sediment flow rates, Absolute 
Prediction Error, Integral Square Error, Correlation Coefficient and Coefficient 
of Efficiency of the model are obtained as 3.9934, 9.0007, 5.3286, 0.9951 and 
0.9659 respectively. The study reveals that the developed model is a very 
effective tool in the real time forecasting of sediment yield in Thuthapuzha 
drainage basin. 

</subfield>
  </datafield>
  <datafield tag="700" ind1=" " ind2=" ">
    <subfield code="a">Remadevi A N (Guide)</subfield>
  </datafield>
  <datafield tag="856" ind1=" " ind2=" ">
    <subfield code="u">https://krishikosh.egranth.ac.in/handle/1/5810155066</subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="2">ddc</subfield>
    <subfield code="c">TH</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">ddc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="a">KAUCLV</subfield>
    <subfield code="b">KAUCLV</subfield>
    <subfield code="c">THESES</subfield>
    <subfield code="d">2014-03-18</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">631.3 BAB/MA</subfield>
    <subfield code="p">172179</subfield>
    <subfield code="r">2014-03-18 00:00:00</subfield>
    <subfield code="w">2014-03-18</subfield>
    <subfield code="y">TH</subfield>
  </datafield>
</record>
